New Dealership in Wakefield – Audi

This project was for a new state of the art Audi Facility including Showroom, Drive-in Service Centre & Cafe – our first project for Morgan Sindall PLC after recently achieving ‘approved sub-contractor’ status.

Client: Morgan Sindall PLC
Project: New Audi Dealership – Wakefield
Location: Calder Park, Wakefield
Project duration: Ground Floors 4 days / Upper Floor 2 days / External Hardstanding 3 days
Project completion date: November 2011
Sub-contract value:  110K

Services provided:

  • 2600m2 Internal Ground Floor Slabs – 150mm thick with 1 layer of mesh reinforcement. Traditional hand-laid floor with a powerfloated finish to class SR3 in accordance with BS 8204-2: 2003
  • 700m2 Upper Floor – Composite metal deck 130mm thick with 1 layer of continuous mesh reinforcement. Pumped concrete with a float finish to receive screed by others
  • 900m2 External Hardstanding – 200mm thick with 1 layer of mesh reinforcement. Pavement laid manually using traditional ‘hit & miss’ bay method with a brushed finish & trowelled margins.

Why we were chosen:

  • Extensive experience & expertise in all types of in-situ concrete floors – Internal, External & Composite Upper floors
  • Experience & expertise in the application & finishing of dry-shake toppings
  • Recently achieved status as an approved sub-contractor for Morgan Sindall PLC
  • CCF Ltd able to handle a ‘multi-floor’ sub-contract package

Issues and constraints we had to work around:

  • Internal Slab: Maintenance area floor required a coloured dry-shake topping to provide a hard-wearing, maintenance-free floor surface – we drew on our experience and expertise to achieve this
  • Working over under-floor heating & a large number of service points meant careful working & close co-operation with client & other contractors.