Our Client: MCS Group

Project: New Build Warehouses

Location: Leeds

Project Duration: 5 Weeks

Project Completion: August 2023

Sub-Contract Value: £1m

 

Services Provided:

  • Bespoke Design, and full supply of labour, plant, and materials
  • 175mm, 180mm & 200mm thick ground floor, power float finished concrete slabs throughout various different buildings with one layer of A193 mesh and saw cut joints
  • 11,000m2 machine laid using laser controlled levelling to FM2 classification, in line with TR34 4th
  • 10,000m2 machine laid using laser controlled levelling to FM1 classification, in line with TR34 4th
  • Independent floor level surveys to verify FM1 & FM2 classifications

 

Why we were chosen:

Bespoke design service, previous good working relationship, and experience laying FM1 &FM2 classification floors