
University of Oregon students have okayed a $50 million expansion of the Student Recreation Centre. The big project includes adding a three-court gym and the finished Student Recreation Centre will have polished concrete floors, and tile accents throughout.
Ground-breaking is scheduled for July 10 and when construction is completed about 18 months hence, the difference will be dramatic, especially in size – the centre will be 300,000 square feet, double what it is today.
Expansive windows in the top two stories will offer a view of the Coburg Hills. The cardio room will be doubled as will the strength and fitness areas. This will complimented by a spin room with really high-end bicycles.
Plans call for the 55-year-old Leighton Pool to be capped and used as a cistern to store grey water — waste water from showers and sinks — which will be used to flush recreation centre toilets. The “jewel” of the project will be an aquatic centre with a 12-lane lap pool, a separate recreation pool and a 16-person spa with bubble-and-jet massage action — and with a waterfall spilling down into its waters.
The finished Student Recreation Centre will not be a bare bones facility despite its modern look which includes polished concrete floors fitted by specialist concrete flooring contractors. The University of Oregon needs a souped-up Student Recreation Centre to keep enrolment growing; high school seniors on college tours will respond to the so-called wow factor.
There are a wide variety of different methods that builders use to get their concrete flooring foundations put into their construction projects. ...
Read MoreAt e-retailer Amazon’s Seattle, Washington headquarters, three large glass dome structures have been built. Inside are 40,000 plants that grow ...
Read MoreDue to the recent hurricanes in the United States, many thousands of homes have been flooded. This has ruined wooden floors and carpets, leaving ...
Read More